Tuesday, March 1, 2011
DATA
all data files have been sent to everyone. Let me know if you didn't get them.
Not included: scanned checklist, audio files.
Thanks,
Patrick.
Not included: scanned checklist, audio files.
Thanks,
Patrick.
RC 367 launch schedule
8:35-go over schedule
8:45-pre-flight check, go over forecast
9:05-move equipment to launch trailer
9:25-set up laugh site
9:40-30 minute call
10:05-5 minute call
10:10-launch
Pre-flight checks:
Radiosonde S12109 frequency 402
Balloon track done with 600 gram balloon
Data in lab looks good
8:45-pre-flight check, go over forecast
9:05-move equipment to launch trailer
9:25-set up laugh site
9:40-30 minute call
10:05-5 minute call
10:10-launch
Pre-flight checks:
Radiosonde S12109 frequency 402
Balloon track done with 600 gram balloon
Data in lab looks good